        并網前先算筆賬:你的氣夠不夠養(yǎng)一臺機器

        發(fā)布時間:2026-11-06 發(fā)布人:中拓 發(fā)布來源:http://miaotoo.net/

        很多廠區(qū)上燃氣發(fā)電,決策起點是“火炬在燒,浪費可惜”。但真正決定項目能不能跑通的,不是環(huán)保壓力,是氣源與負荷的時間錯配。

        Many factories use gas-fired power generation, and the starting point for decision-making is' the torch is burning, it's a waste '. But what really determines whether the project can run smoothly is not environmental pressure, but the mismatch between gas source and load time.

        20221028050531915

        先畫兩條曲線,再談設備:

        Draw two curves first, then talk about the equipment:

        產氣曲線:沼氣產量跟進料量、溫度、季節(jié)強相關,夏天高冬天低,一天內也可能波動;

        Gas production curve: The biogas production is strongly correlated with the amount of feed, temperature, and season, with higher yields in summer and lower yields in winter, and may fluctuate within a day;

        用電曲線:廠區(qū)的峰谷平負荷,跟生產班次綁定。

        Electricity consumption curve: The peak valley load of the factory area is tied to the production shift.

        兩條線對齊,才有經濟賬。如果產氣高峰在夜間、用電低谷也在夜間,發(fā)的電只能低價上網甚至棄電,IRR直接打折。

        Align two lines to have an economic account. If the peak gas production occurs at night and the low electricity consumption also occurs at night, the electricity generated can only be connected to the internet at a low price or even abandoned, and IRR will be directly discounted.

        選型順序要倒過來想:

        The selection order should be reversed:

        先定運行模式——純自發(fā)自用、自發(fā)自用余電上網、還是全額上網?模式不同,對機組調節(jié)能力和并網柜配置要求完全不同。

        Set the operating mode first - pure self use, self use surplus electricity for grid connection, or full grid connection? Different modes have completely different requirements for unit regulation capability and grid connected cabinet configuration.

        再定臺數和單機功率——不是越大越好。一臺大機在氣少時低負載運行,效率和壽命雙輸;兩臺小機并聯,氣多全開、氣少停一臺,容錯空間大。

        Re determine the number of units and individual power - not the larger the better. A large machine operates at low load when there is little gas, with dual efficiency and lifespan; Two small machines are connected in parallel, with one fully open when there is more air and one stopped when there is less air, providing a large margin for fault tolerance.

        最后才是機組技術參數——點火方式、調速方式、冷卻方式、噪音控制,按安裝環(huán)境逐個敲。

        Finally, the technical parameters of the unit - ignition mode, speed regulation mode, cooling mode, noise control - are tapped one by one according to the installation environment.

        并網這關比機器本身難:

        Grid connection is more difficult than the machine itself:

        低壓并網要過防孤島保護、逆功率保護、電能質量測試;

        Low voltage grid connection requires islanding protection, reverse power protection, and power quality testing;

        高壓并網涉及同期裝置、PT柜、計量柜,供電局驗收標準因地而異;

        High voltage grid connection involves synchronous devices, PT cabinets, and metering cabinets, and the acceptance standards of power supply bureaus vary by location;

        提前拿接入系統(tǒng)批復,別等設備到了再跑手續(xù),周期拖半年起步。

        Get the approval for the access system in advance, don't wait for the equipment to arrive before running the procedures, the cycle will be delayed for half a year.

        容易被砍掉但實際救命的配置:

        Easy to cut but actually life-saving configuration:

        雙膜氣柜做緩沖,削峰填谷,讓機組吃"平"的氣而不是"浪"的氣;

        Double membrane gas cabinets are used for buffering, peak shaving and valley filling, allowing the unit to consume "flat" gas instead of "wave" gas;

        余熱回收別只算熱水,算到發(fā)酵罐保溫、廠區(qū)采暖、甚至溴化鋰制冷,綜合能效才能撐起回報期。

        Waste heat recovery should not only be considered for hot water, but also for fermentation tank insulation, factory heating, and even lithium bromide refrigeration. Only with comprehensive energy efficiency can the payback period be sustained.

        項目能不能回本,算的是氣電匹配度、余熱利用率、運維出勤率,不是標稱功率多大。

        Whether the project can recoup costs depends on the gas electricity matching degree, waste heat utilization rate, and operation and maintenance attendance rate, not the nominal power.

        截屏,微信識別二維碼

      1. RM新时代APP官网
        <strike id="09wou"><video id="09wou"></video></strike>

          
          
            <tfoot id="09wou"></tfoot>
            <b id="09wou"><nobr id="09wou"></nobr></b>
              <center id="09wou"></center>
              <ruby id="09wou"></ruby>
              <strike id="09wou"><video id="09wou"></video></strike>

                
                
                  <tfoot id="09wou"></tfoot>
                  <b id="09wou"><nobr id="09wou"></nobr></b>
                    <center id="09wou"></center>
                    <ruby id="09wou"></ruby>
                    RM新时代是骗人的吗 RM新时代app下载 rm新时代是什么时候开始的 RM新时代还能玩多久 新时代app游戏